PROJECT
SHIP TO SITE HEAVY LIFT PROJECT
The Pupuk Sriwijaya Palembang Project was a complex heavy-lift logistics operations consisting the transportation of three oversized cargo with a total volume of 4,625.55 freight tons. The scope of operations from ship-to-ship transfer at Anchorage off the coast of Palembang, barge roll-off operations at Jetty, and inland transportation to the Pupuk Sriwijaya site using 30 axle Modular Trailer. The project required detailed planning, route engineering, and precise execution to ensure safe and timely delivery.
PROJECT
GEOTHERMAL & POWER PLANT PROJECT AT LUMUT BALAI
SEPCO III Electric Power Construction Co. Ltd carried out Geothermal & Power Plant Project at Lumut Balai. We were responsible for executing the transport of general cargo and over dimension cargo with estimated total weight up to 52.250 FT including Splitter Generator, Steam Scrubber, Rotor and Transformer from Palembang Port to the project site in Muara Enim, utilizing two sets of 10 axle modular trailers with total route covered an approximate distance of 165 km.
PROJECT
POWER PLANT PROJECT AT BUKIT ASAM
Huadian Bukit Asam Power carried out Sumatera Selatan 8 Power Plant Project at Bukit Asam.We managed the transport of general cargo and over dimension cargo with total weight up to ± 400.000 FT including 300T Generator Stator & 115T Transformer.
All over dimension cargo was delivered using modular trailers with 18 and 12 axle line configurations, carefully selected to match the load specifications and ensure transport safety.